
Client: G3 Lab
Scope of Works: This fit-out project involved transforming 600 sqm of space at the Woolcock Institute of Medical Research Centre in Glebe into a state-of-the-art PC2-certified laboratory and medical research facility. The project was designed and executed to meet Physical Containment Level 2 (PC2) laboratory requirements, ensuring compliance with stringent safety, operational, and regulatory standards for advanced medical research and clinical studies.
Key Works Completed:
-
Demolition & Site Preparation – Stripped out existing infrastructure to prepare for a high-spec medical and research fit-out.
-
PC2 Laboratory Fit-Out – Constructed specialist PC2-compliant laboratories, incorporating controlled environments, biosecurity measures, and high-grade materials to support research activities.
-
Clinical & Research Spaces – Delivered medical consultation rooms and treatment areas designed for clinical efficiency, infection control, and patient privacy.
-
Specialist Mechanical, Electrical & Plumbing (MEP) Services – Installed laboratory-grade ventilation systems, HEPA filtration, fume extraction units, medical gas infrastructure, and precision lighting to meet PC2 safety requirements.
-
Custom Joinery & Laboratory Finishes – Implemented durable, non-porous surfaces and high-quality joinery, ensuring compliance with biosafety regulations.
-
Compliance & Certification – Completed rigorous testing, commissioning, and certification to meet Australian PC2 laboratory standards and regulatory guidelines.
This project enhances the Woolcock Institute’s research capabilities by providing a cutting-edge, fully compliant PC2 laboratory facility, supporting innovative medical research and clinical advancements.



